Skip to content

A station is coming in Bedok

The rule: No MRT/LRT exit within 500 m today, and a planned new station (announced by LTA) within 500 m.

In Bedok, 30 HDB blocks, 14 condos and 31 landed streets fit. The planned stations that come up most are Bedok South and Sungei Bedok. Sorted by name, not ranked. Tap one to see it on PropKaki Atlas.

HDB blocks (30)

  • Blk 66 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 381 m · MRT/LRT: Bayshore, 548 m, about 17 min walk

  • Blk 67 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 379 m · MRT/LRT: Bayshore, 605 m, about 17 min walk

  • Blk 68 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 444 m · MRT/LRT: Bayshore, 567 m, about 17 min walk

  • Blk 69 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 416 m · MRT/LRT: Bayshore, 630 m, about 16 min walk

  • Blk 152A Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 13 m · MRT/LRT: Bayshore, 675 m, about 18 min walk

  • Blk 152B Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 58 m · MRT/LRT: Bayshore, 700 m, about 19 min walk

  • Blk 152C Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 127 m · MRT/LRT: Bayshore, 733 m, about 20 min walk

  • Blk 153A Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 203 m · MRT/LRT: Bayshore, 771 m, about 20 min walk

  • Blk 153B Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 193 m · MRT/LRT: Bayshore, 719 m, about 18 min walk

  • Blk 153C Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 151 m · MRT/LRT: Bayshore, 687 m, about 17 min walk

  • Blk 154A Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 100 m · MRT/LRT: Bayshore, 667 m, about 17 min walk

  • Blk 154B Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 48 m · MRT/LRT: Bayshore, 641 m, about 16 min walk

  • Blk 155 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 169 m · MRT/LRT: Bayshore, 660 m, about 17 min walk

  • Blk 156 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 192 m · MRT/LRT: Bayshore, 592 m, about 16 min walk

  • Blk 157 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 204 m · MRT/LRT: Bayshore, 634 m, about 17 min walk

  • Blk 158 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 260 m · MRT/LRT: Bayshore, 610 m, about 16 min walk

  • Blk 159 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 238 m · MRT/LRT: Bayshore, 660 m, about 17 min walk

  • Blk 160 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 287 m · MRT/LRT: Bayshore, 656 m, about 17 min walk

  • Blk 161 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 255 m · MRT/LRT: Bayshore, 722 m, about 18 min walk

  • Blk 162 Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 247 m · MRT/LRT: Bayshore, 743 m, about 19 min walk

  • Blk 163 Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 263 m · MRT/LRT: Bayshore, 780 m, about 19 min walk

  • Blk 164 Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 284 m · MRT/LRT: Tanah Merah, 742 m, about 12 min walk

  • Blk 165 Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 342 m · MRT/LRT: Tanah Merah, 708 m, about 13 min walk

  • Blk 166 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 355 m · MRT/LRT: Tanah Merah, 737 m, about 12 min walk

  • Blk 167 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 329 m · MRT/LRT: Bayshore, 693 m, about 18 min walk

  • Blk 168 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 392 m · MRT/LRT: Bayshore, 722 m, about 18 min walk

  • Blk 169 Bedok Sth Ave 3

    Bedok South (planned, TEL · LTA target 2nd half 2026) 394 m · MRT/LRT: Tanah Merah, 698 m, about 12 min walk

  • Blk 170 Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 363 m · MRT/LRT: Tanah Merah, 669 m, about 13 min walk

  • Blk 171 Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 407 m · MRT/LRT: Tanah Merah, 648 m, about 12 min walk

  • Blk 172 Bedok Sth Rd

    Bedok South (planned, TEL · LTA target 2nd half 2026) 444 m · MRT/LRT: Tanah Merah, 675 m, about 10 min walk

Condos and apartments (14)

  • Bagnall Haus

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 3 m · MRT/LRT: Tanah Merah, 1,193 m

  • Casa Flora

    Bedok South (planned, TEL · LTA target 2nd half 2026) 292 m · MRT/LRT: Tanah Merah, 761 m

  • Country Park Condominium

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 92 m · MRT/LRT: Tanah Merah, 1,028 m

  • Eastwood Centre

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 92 m · MRT/LRT: Tanah Merah, 1,188 m

  • Eastwood Green

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 182 m · MRT/LRT: Tanah Merah, 1,078 m

  • Eastwood Lodge

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 6 m · MRT/LRT: Tanah Merah, 1,392 m

  • Eastwood Regency

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 2 m · MRT/LRT: Tanah Merah, 1,430 m

  • Fairmount Condominium

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 2 m · MRT/LRT: Tanah Merah, 1,275 m

  • Kew Gate

    Bedok South (planned, TEL · LTA target 2nd half 2026) 344 m · MRT/LRT: Tanah Merah, 647 m

  • Kew Green

    Bedok South (planned, TEL · LTA target 2nd half 2026) 0 m · MRT/LRT: Bayshore, 865 m

  • Kew Residencia

    Bedok South (planned, TEL · LTA target 2nd half 2026) 47 m · MRT/LRT: Bayshore, 799 m

  • Laguna 88

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 2 m · MRT/LRT: Expo, 1,427 m

  • Palm Tree Nines

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 275 m · MRT/LRT: Tanah Merah, 1,019 m

  • Tanah Merah Mansion

    Bedok South (planned, TEL · LTA target 2nd half 2026) 454 m · MRT/LRT: Tanah Merah, 536 m

Landed homes, by street (31)

  • Bedok Avenue53 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 92–420 m · MRT/LRT 852–1,190 m

  • Bedok Garden37 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 385–473 m · MRT/LRT 803–934 m

  • Bedok Road4 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 281–454 m · MRT/LRT 922–1,056 m

  • Bedok South Avenue 32 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 444–456 m · MRT/LRT 634–635 m

  • Bilal Lane21 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 300–389 m · MRT/LRT 896–1,037 m

  • Eastwood Drive53 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 254–366 m · MRT/LRT 1,093–1,243 m

  • Eastwood Green51 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 188–299 m · MRT/LRT 1,156–1,284 m

  • Eastwood Place28 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 128–219 m · MRT/LRT 1,219–1,312 m

  • Eastwood Road41 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 4–332 m · MRT/LRT 1,036–1,455 m

  • Eastwood Terrace48 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 53–141 m · MRT/LRT 1,283–1,401 m

  • Eastwood Walk33 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 131–232 m · MRT/LRT 1,261–1,350 m

  • Eastwood Way28 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 72–315 m · MRT/LRT 1,229–1,438 m

  • Jalan Bilal10 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 244–295 m · MRT/LRT 985–1,036 m

  • Jalan Greja45 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 318–454 m · MRT/LRT 961–1,169 m

  • Jalan Haji Salam77 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 174–446 m · MRT/LRT 811–1,205 m

  • Jalan Kathi36 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 449–494 m · MRT/LRT 787–916 m

  • Jalan Limau Bali9 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 490–499 m · MRT/LRT 522–533 m

  • Kew Avenue41 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 296–389 m · MRT/LRT 655–726 m

  • Kew Crescent70 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 74–321 m · MRT/LRT 711–1,023 m

  • Kew Drive116 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 140–471 m · MRT/LRT 576–1,155 m

  • Kew Heights73 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 84–340 m · MRT/LRT 715–954 m

  • Kew Lane8 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 392–462 m · MRT/LRT 581–669 m

  • Kew Terrace25 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 219–296 m · MRT/LRT 770–829 m

  • Kew Walk35 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 154–247 m · MRT/LRT 832–894 m

  • Limau Garden85 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 312–499 m · MRT/LRT 576–780 m

  • Limau Grove18 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 459–500 m · MRT/LRT 754–798 m

  • Pesari Walk12 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 432–489 m · MRT/LRT 958–1,018 m

  • Salam Walk32 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 292–438 m · MRT/LRT 786–895 m

  • Taman Bedok24 houses

    Sungei Bedok (planned, TEL/DTL · LTA target 2nd half 2026) 413–499 m · MRT/LRT 890–1,086 m

  • Tanah Merah Kechil Road South24 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 348–461 m · MRT/LRT 581–678 m

  • Upper East Coast Road22 houses

    Bedok South (planned, TEL · LTA target 2nd half 2026) 56–250 m · MRT/LRT 518–1,232 m

Other towns for A station is coming

How this is measured

  • Distances are straight lines, in metres, from the home's building (for a condo, the development's land) to the nearest MRT/LRT exit, park edge or place - the same measurement as the Near view on PropKaki Atlas, as of 13 October 2026. Walking routes can be longer.
  • Planned stations are LTA announcements with LTA's own opening timing. They are not built yet, and timings can change.
  • Homes are listed by name and town (URA planning areas), never ranked, with no prices and no listings. Landed homes are grouped by street, never shown one house at a time.

Sources: PropKaki Near build 2026-10-13 · URA planning areas 2019 (OneMap) · LTA rail announcements (checked weekly) · OpenStreetMap contributors (ODbL). Street names © OpenStreetMap contributors. All data sources and licences.